First operated in 1973, the University pool was 50m by 18m in length and width. To enhance the potential of the pool for teaching and general use by the CUHK community, major changes made in the recent renovation include taking out the diving platform. Shallow areas of 1.35m have been built at the two sides of the pool according to the safety design and standard requirement of the swimming pool license, so that the beginners could be allowed to practice with ease. Other enhancements include replacing mosaic tiles with more durable ceramic ones for the walls and bottom of the pool; the use of non-slippery hardwood flooring for the passage leading to the pool, and putting up of a glass screen in front of the spectator stand to enhance safety. Try out the new and enhanced University Swimming Pool this summer with added fun and safety features! To learn more about alumni use of the University Swimming Pool, please click here. For more details of the newly renovated Swimming Pool, please visit http://www.cuhk.edu.hk/osa/notice/pool20081222.doc (Chinese version only). |